Which cars does this part fit?
| Brand | Model | Year | Type | Engine |
|---|---|---|---|---|
| Audi | ALLROAD | 02-05 | 5 SP 4WD | V6 2.7L V8 4.2L |
| Audi | S4 | 00-02 | 5 SP 4WD | V6 2.7L |
| BMW | 3-SERIES | 00-07 | 5 SP RWD | L6 2.2L 2.5L 3.0L |
| BMW | 5-SERIES | 02-03 | 5 SP RWD | L6 2.5L |
| BMW | Z4 ROADSTER | 02-05 | 5 SP R/4WD | L6 2.2L 2.5L 3.0L |
| Jaguar | S TYPE | 01-03 | 5 SP RWD | V6 2.5L 3.0L |
Description
This part is New and fits your 5HP19. Speed Sensor is an important part of 5HP19 transmission. On go4trans.com you will find best deals from worldwide suppliers of New, Aftermarket parts for 5HP19 and other automatic transmissions.
Information about basic repairs for 5HP19 can be read here.
Information about basic repairs for 5HP19 can be read here.
It is possible that with ZF5HP19 Speed Sensor With Long Lead you also need other 5HP19 parts:
Overhaul Kit| Friction Kit| Friction| Steel Plate| Steel Kit| Band| Solenoid Kit| Solenoid EPC| Solenoid TCC| Pump| Shaft| Drum| Valve body| Torque converter| Hub| Piston| Piston Kit| Planetary Gear| Filter| Gasket| Bushing| Seal| Bearing| Pressure Plate| Stator| Differential| Retainer| Inhibitor Switch| Instruction manual| TOOLS & ACCESORIES| Sensor
Overhaul Kit| Friction Kit| Friction| Steel Plate| Steel Kit| Band| Solenoid Kit| Solenoid EPC| Solenoid TCC| Pump| Shaft| Drum| Valve body| Torque converter| Hub| Piston| Piston Kit| Planetary Gear| Filter| Gasket| Bushing| Seal| Bearing| Pressure Plate| Stator| Differential| Retainer| Inhibitor Switch| Instruction manual| TOOLS & ACCESORIES| Sensor
Speed sensors of the gearbox receive the data on transmission speed parameters and transfer this info to the TCU. Thanks to this data, the TCU regulates the shifting pressure and specifies an appropriate gear to be engaged